Daily maintenance analysis of automatic labeling machine equipment
Jan 31, 2023
The fully automatic labeling machine is necessary to perform inspection operations before the equipment use, during use and after use. If there is an abnormal response until the technical personnel do maintenance during maintenance, the following is the content of daily maintenance operations:
1. After the daily machine operation, the power is disconnected, and the surface of the machine, the operation table and other parts.
2. Equipment requirements ensure that the supporting power supply voltage can be used to put it in production normally.
3. Check the tightening level of all bolt connections. If it is found, it should be tightened in time.
4. Check the operating parts such as chain. If there are disadvantages, it should be cleaned in time. And keep up to make up for the bold oil, and the gear meshing surface is smooth or butter.
5. The operation status of various positioning and testing equipment should be misplaced. If necessary, adjust it from scratch.
6. Check whether all kinds of air roads and joints are loose and falling.
7. Check whether each belt slipped.
After working for 10 hours after working for 10 hours, the full -automatic labeling machine equipment needs to be stopped for half an hour. The daily maintenance content of the above equipment, especially the non -standard equipment. In order to reduce equipment loss and extend the service life of the equipment. In the event of holidays or equipment, it is necessary to clean the equipment, eliminate oil, and perform smooth maintenance.
Producers should arrange production tasks reasonably according to the function, technical conditions, processing planning, and load talents of the equipment. Do not overload, over -planned use equipment. Do not pursue the output and fight for equipment one -sided, the repair time of the repair or seizing equipment is not repaired. Small problems will cause more serious disadvantages.







